Blog from December, 2021

Set Up 02 Dec 21

Weather:

Sunny and warm


Tasking: 

First day of setup(not counting the October trip). 

  • Received base trailer at trainyard, setup porch and organized totes.
  • Liz and John discovered power drop for ISS pivot site was installed on the wrong pole, electrician said it was moved to the correct site and powered as of 5pm today.
  • Checked out DCS power drop and staged some equipment. Drop is almost complete, needs inspection, then Heber Light and Power will connect.
  • Offloaded most of the Penske at the storage unit.
  • Staged equipment at PRS and ran power cable part of the way to the outlet on adjacent property. That landowner was present and we determined where to run the cable, will do so in the next couple of days. 

Solid first day of organizing and offloading, tomorrow we will being instrumentation. Thanks for the help, Liz and John!