The Vertical winds still have an offset according to Project Management.
Opened the radome and blew from the drain port up to the hole to see if there was anything in the line. The Top line had a small amount of water come out. The bottom line was clear. I also opened the center port and blew it out, there we a very small amount of water that came out. I do not think any of the amounts that i saw would be enough to total block a line.
Chris is going to look and see if there is a difference between the OTREC Test flights and yesterday's flight to see if we are fixing stuff or not.
1 Comment
John Cowan
5/18/19
Maintenance day
The Vertical winds still have an offset according to Project Management.
Opened the radome and blew from the drain port up to the hole to see if there was anything in the line. The Top line had a small amount of water come out. The bottom line was clear. I also opened the center port and blew it out, there we a very small amount of water that came out. I do not think any of the amounts that i saw would be enough to total block a line.
Chris is going to look and see if there is a difference between the OTREC Test flights and yesterday's flight to see if we are fixing stuff or not.