|
|
|
|
|
|
|
|
|
|
|
|
|
Bye Bye
|
|
|
|
|
|
|
|
|
|
On NEAR looking NE seeing BASE and RIM
|
|
|
|
|
|
Looking SW from FLR at Gordon on RIM
|
Looking South
|
Laura helping bracket RIM
|
|
|
|
|
Dressed upper RIM
|
RIM dressed
|
RIM
|
RIM
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Scratched paint
|
|
|
|
|
|
|
Theodolite and RIM
|
|
|
|
|
|
|
|
|
Another view from RIM looking South-ish over mining village
|
|
|
|
|
|
|
Random shot of RIM tower looking at crater floor
|
Mining village from RIM, looking South-ish
|
View of West rim of crater from RIM tower
|
View of South wall of crater from on RIM tower
|
|
|
|
|
Showing Southeast from on RIM tower
|
Looking down from RIM tower (~110') at south anchor
|
Looking down at NE anchor from RIM
|
View on RIM tower to crater
|
|
|
|
|
|
|
|
RIM tower with dead weight anchors
|
|
|
|
|
Looking SW from FLR
|
I believe this is NEAR tower
|
Shot of NEAR tower set up but NOT tensioned
|
View of NEAR looking NE-ish
|
|
|
|
|
View of FLR south
|
Set up of FLR
|
Anchors installed at FLR
|
Install of FLR anchors
|
|
|
|
|
LIDAR set up
|
LIDAR set up w/ Kurt's wise cracks
|
LIDAR set up
|
Views from LIDAR spot
|
|
|
|
|
More views from LIDAR area
|
|
|
|
|
|
|
|
|
Shot from RIM to BASE
|
|
Crater shots from camera position
|
|
|
|
|
|
|
Showing the camera position for RIM setup
|
|
|
|
|
|
|
|
|
Wetness at BASE
|
|
|
|
|
Rain at staging area (BASE)
|
Random shots of water at BASE
|
Showing water running down driveway for BASE
|
Looking into crater looking North from RIM
|
|
|
|
|
Mining building by RIM
|
Buildings by RIM
|
Storm to the South with a funnel cloud
|
Close up on storm w/ funnel cloud near BASE
|
|
|
|
|
Building the anchor baskets for RIM
|
|
|
|
|
|
|
|
Hotel in Flagstaff
|
NEAR site arrival
|
Anchors being installed at NEAR
|
Installing trouble third anchor at FAR
|