Installed the two sonics at SSW2 and SSW4 today, after much running up and down the crater sidewall to get the correct cables to plug into the motes (and even up to the rim for a delivery of sonic cables by to Matt from Gordon) to get the correct cables to plug into the motes. Also installed a second 30W(?) solar panel at both sites. These were scavenged from the solar panel stands at FLR. FLR is now powered by 4 60W(?) solar panels.
...
After installing the sonic, I tried to calibrate the data scope, but was unsuccessful because of the requirement to rotate through 8 eight 45 degree increments within two minutes while standing still on a steep, treacherous slope. Measured the magnetic orientation of the sonic (no declination applied):
...