...
15:00 took the first sample (still before wetting; soil was a little bit moist). I'll just measure the 3-6cm ring, as being close to the location of the EC5 (volume = 3*pi*(5.31/2)^2 )
10/25: 09:35 First watering. Water ponded. I'll wait a bit and reapply.
Date | Time | Tare | Wet | Dry | Rho | Grav% | Vol% | EC-5 |
---|---|---|---|---|---|---|---|---|
10/24 | 15:00 | 2.4 | 84.3 | 77.8 | 1.14 | 8.3% | 9.5% | 9.5% (EXACT!) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|