...
- (Towers still up at 449 and base. Base still has its (disconnected) 2D sonic on the top.)
Tues. Afternoon update:
- Helo ops complete. Everything out of crater; fencing panels taken into crater; concrete block anchors and frames removed from rim (just using the rebar).
- ISS rental lidar loaded into NCAR (Tim's) trailer
- Utah lidar loaded into Utah trailer. Utah/KIT equipment now packed and ready for their drive home tomorrow.
- Removed tower at base.
- Just have one tower section (deliberately) left at rim and the ISS 40' tower left to take down.