Kris and Dan cleaned the krypton sensors at sites 2 and 4.

After later talking with Steve Oncley, the maintenance has improved readings from the sensors as both sites have voltage readings above 100 mV.

Time history of site visit (all times CDT)

Site 2

14:00 site arrival and begin lowering mast

14:08 mast lowered

14:11 Kris cleans sensor lens

14:13-14:22  Mast in vertical position and south facing guy anchor hook is fastened

(delay from the anchor hook on the north-east facing tripod leg twisted into the wrong position when the mast was being lifted.  Mast was partially lowered to reposition the anchor hook before raising the mast to its final vertical position)

14:32   leaving the site

Site 4

15:00 arrive at the mast

15:08 mast is lowered

15:10 Kris cleans sensor lens

15:13-15:17 mast is returned to vertical position and south facing guy anchor hook is fastened

15:20  leaving the site