10/20/13
Summary:
- Everything is working
- IOP4 ended successfully. Warm air intrusions occurred between 10pm and 2am.
Actions past 24 hours:
- Floor: cleaned radiometers (they needed it) and changed P.NNE battery
- Reseated connector to revive SPN1.near.
To dos:
- Take gravimetric soil samples (scales and oven should arrive today with Semmer)
Sensor status:
T/RH: ok
P: ok
csat u,v: ok
csat ldiag: ok
csat w, tc: ok
kh2o: ok. Sebastian cleaned flr yesterday.
motes: ok. SPN1.near died last night, but revived by reseating sensor cable.
Wetness: ok.
radiation: flr cleaned yesterday (and were dirty). Will watch to see if SPN1/psp comparison improves.
Tsoil: ok
Gsoil: ok
Qsoil: Still need to recalibrate far and flr.
Cvsoil: ok
2D sonic: ok