  • secure cables with cable ties
  • set solar panels to 50 deg
  • unplug/plug 10cm Qsoil to verify position

rad:

  • level schwartz (darkhorse is level)
  • secure cables with ties (now just wrapped)

tower:

  • secure modem/bluetooth boxes
  • secure cables with ties
  • rework winching system; possibly other tower adjustments (including guy wires)
  • add EC150 head
  • add EC100 box and cables
  • shoot boom angles on both sonics (shoot the N-S axis, denoted by the (nearly invisible) red dot and silver/blue line on the label below the north arm).

...