Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Cleaned the EC150 3D sonic cable end with contact cleaner and cleaned the cable receptacle. It restarted with success and is collecting data.

Image Added

Reshot boom angles of sonics at 10 m and 3 m. The 2D sonic at 10 m had an azimuth of 319 deg. The 3D sonic azimuth was 227 deg.

...