Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  • Kurt/Lucas/Laura/Bob? ran up and down the mountainside trying to power up stations.
  • Dan helped the INEGI crew instrument tse05.  The last 60m tower is now up and instrumented.  I think its solar-power system is working as well (but, presumably due to power, the network is totally down, so we can't verify from here)
  • Andy and I prepped 4 more towers.
  • Ted and Santiago prepped Ubiquitis, tweaked the network configuration, and arranged for a bittorrent stream of data to Boulder
  • Gary doesn't know what he did, but he stayed warm working in outside in the parking lot...

...