...
- installed rad and soils in corn at rel, plugged into rel.a1, USB7.
- took a long break with a telecon and lunch
- added NR01 in soybeans at lconv
- installed rad and soils in grass at uconv, plugged into a2, USB7. THIS COMPLETES SENSOR INSTALLATION!
- Did some ATV moving of PI equipment
- Cleaned our sites of extraneous stuff
- Starting sensor status, seeing a bunch of stuff
- uconvm, lconv1, lconvt needed ddn/dup to appear in cockpit
- still 10m csat3 on uconvm is not responding
- lots of cockpit scales need to be set (easy addition to .xml)
- 10m csat3 on lconvm is reporting bad data
- 6m init csat3 in bad cycle mode (needs a head swap – our last spare (we had one other bad already))
- ...and I'm sure there's more
- A visit to storage with a few things
...