- redo cabling from 7m EC100, send it through the rings instead of down the leg of the tower.
- The config says the barometer is at 7m but we installed it at 27m, so either change the config or switch which EC100 box the barometer cable goes to.
- I pinched the cable to the 17m TRH (I think) while raising it. Still seems to work fine, but I marked the point that got pinched on the cable with white tape.
- If we remember next time, we could replace the 15m bulgins with 5m bulgins for the cables to the top level, since they already have 25m bulgins on them.
- DSM dashboard only shows a blank screen.