Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  • test heating scripts
  • it appears that I'm close to parsing the RAD_LOGGER message correctly, but we should check with Sebastian.  I suspect that my "Rpile" variable from him really is an uncalibrated pile voltage.
  • why are there still "Early sample...prior to sorting window" errors using prep?  I thought our new timing fixed all this!
  • why are there frequent "EMERGENCY|SampleOutput: inet:128.117.43.122:30010: IOException: inet:128.117.43.122:30010: send: Message too long, disconnecting" error messages on the DSM consoles?  Could these be from the OTT, that reports something like a 32k byte sample?
  • create irga_co2/h2o.dat QC files by height for supersites
  • update all csat.dat QC files once boom angles are known.

Sonic status:

siteec100ec150csat
upokokok
lc
x
ok (fuse replaced)okok
ccokokok
dcokokok
spokokok
shokokx
mhokokok
pcokokok
mwok (replaced)x
x
ok (replaced)
prs.1m
x
ok (replaced)okok
2mok (replaced)okok
3mokokok (replaced)
7mokok
x
ok (replaced)
17m
x
bad port (will need to replace dsm)ok?ok?
32mokok
x
ok (replaced)
dcs.1mokokok
2mokxok
3mokxok
7m
?
ok
?
ok
?
ok
17m
?
ok
?
ok
?
ok
32m
?
ok
?
ok
?
ok