Tried to prepare units 813 and 1163 for installation at 30 meters, but could not get them to boot and run with required length of cable. Red LED at circuit board would stay on, or blink on and off. It is supposed to go off once the unit is running. Measured 8 V at the end of 30 meter cable with unit attached. Need to reduce this loss.

Installed S/N 1163, and 1164 at 30 and 16 meters, but witout data/power cables.

...

The beacon was running off a battery with an inverter. Connected the beacon directly to AC and added the battery to the bank of 2 that power the data system and tower sensors. So the beacon is not a load on the DC supply anymore.

...

Distance from top of CNR1 boom to top of 16 meter sonic is 6.31 meters.
So the top of this sonic boom is at 22.38-6.31 = 16.03 meters.

Moved network switch from adam to power enclosure. Dave Gochis will
probably use one of the ethernet ports for his Tsoil CR1000.
After this switch, the fiber/copper media converter would not
connect - even after several power cycles of converter and switch.
Had to power cycle the media converter in the seatainer. This
may mean that the fiber network will not always come up after
a power outage without intervention.

Untaped pressure inlet (13:33 MST).

...