Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

level

Licor 7500 S/N

status

43m

1167

port 17, working

30m

1163

not cabled

16m

1164

not cabled

7m

 

 

2m

 

 

DC power supply in power the enclosure that is charging the batteries is rated at 3 A, which will not be large enough to drive system with 5 Licor 7500s, since each Licor needs about 0.9 A.

The beacon was running off a separately charged battery with an inverter. Connected the beacon directly to AC power and added the battery to the bank of 2 that power the data system and tower sensors. So the beacon is not a load on the DC supply anymore, and there are 3 batteries providing power to the tower, that are charged by the DC supply via a charge controller.

Installed Kipp and Zonen CNR1 net radiometer. Data is being received. Distance from top of CNR1 boom to top of tower base plate is 22.38 meters. Chris said that per the bubble level indicator the unit is quite level.

...