...
From plots of vertical velocity (mostly), wind direction, and pressure, I deduced the following times in at which the masts were
lowered and raised. I entered these times into the sonic qc files (to delete data while the mast was down), adding 5 minutes to the raising time to allow for attaching and adjusting the back guy wire.
...