flux (server laptop):

  • Set up and working, but is interfering with NOAA network and has just been unplugged.  Gary is working with Bruce to fix

 

Tower:

  • 300m DSM is on the network; other DSMs installed but not yet connected to BAO network
  • 9 (of 12) sonics mounted (and collecting data locally on DSMs?).  We'll bring out the remaining 3 (that just got back from Campbell) today
  • 6 TRHs should be mounted and also collecting data (locally)

bao:

  • All instruments up, except EC150 (and EC100).
  • Some mechanical and power issues (power and thus station dying at night).  Kurt and I will visit today to fix.

 

bao:

...

  • Pocketec didn't come up after last power cycle (and doesn't respond using "tusb 1 0/1").  We'll need to cycle power manually...

 

ehs:

  • Julie and I or Kurt will meet with the building superintendent tomorrow afternoon to get site permission.  We'll plant soil sensors and possibly the tripod base at that time, if possible.