flux (server laptop):
- Set up and working, but is interfering with NOAA network and has just been unplugged. Gary is working with Bruce to fix
Tower:
- 300m DSM is on the network; other DSMs installed but not yet connected to BAO network
- 9 (of 12) sonics mounted (and collecting data locally on DSMs?). We'll bring out the remaining 3 (that just got back from Campbell) today
- 6 TRHs should be mounted and also collecting data (locally)
bao:
- All instruments up, except EC150 (and EC100).
- Some mechanical and power issues (power and thus station dying at night). Kurt and I will visit today to fix.
bao:
...
- Pocketec didn't come up after last power cycle (and doesn't respond using "tusb 1 0/1"). We'll need to cycle power manually...
ehs:
- Julie and I or Kurt will meet with the building superintendent tomorrow afternoon to get site permission. We'll plant soil sensors and possibly the tripod base at that time, if possible.