Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Thursday, September 7.   Bruce noticed that the shots per scan we getting noisy (not stable around 170) and slowly decreasing.  The system was restarted  at approximately 0810 PDT with a 5 minute warmup and the BSU was reinitialized.

Image Added

This is the second time that this has occurred - both times the lidar had been operating for multiple days.  The first event happened on Sept 2.

Image Added

LabVIEW restart


Clear and sunny today.

Image AddedImage Added


Some decent gust structures this afternoon in the REAL images.  Here is one example:

Image AddedImage AddedImage AddedImage AddedImage Added

and some corresponding wind retrievals:

Image AddedImage AddedImage AddedImage Added


Here's another sequence:

Image AddedImage AddedImage AddedImage AddedImage AddedImage AddedImage Added

and some corresponding wind fields:

Image AddedImage AddedImage AddedImage Added

But, sometimes conditions become "quiet" (meaning, no gust structures):

Image AddedImage Added

Shane visited site from about 8:15 PM until about 10:00 PM PDT.   Checked mirror downstream of Raman cell.   Inclusion does not look any more advanced then prior photos.

Image Added

0 Z on 8 Sept 500 mb chart:

Image Added