Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Public PPI display from Chico State stuck at 7:41:52 PDT, but remote systems are OK:



NW flow a little after 1 PM PDT today:

Image AddedImage AddedImage AddedImage AddedImage AddedImage AddedImage AddedImage Added


Bruce noticed at 4:40 PM that the SHOTS variable in housekeeping data had slumped.  It should be running around 170.  Very interestingly went from 168 to about 84: a perfect halving and did so in like a tapered cosine over the course of 2 hours.

Image Added

He couldn't get LabVIEW to restart so had to reboot the data system.  Upon restart it forced a scheduled increase in the flashlamp voltage to 1.50 kV.

This caused the 1064 and the 1543 energies to be a little higher than recommendations so he restarted it at 5:50 PM PDT with 250 millisecond q-switch delay (with 5 min warmup).


Image AddedImage Added


Evening (6:06 PM PDT) IR (10.3 micron channel) sat image of the region:

Image AddedImage Added


Image AddedImage Added


Image AddedImage Added

Image AddedImage AddedImage AddedImage AddedImage AddedImage Added


Image AddedImage AddedImage AddedImage AddedImage AddedImage Added

This evening's 500 mb chart:

Image Added