...
- Kurt/Lucas/Laura/Bob? ran up and down the mountainside trying to power up stations.
- Dan helped the INEGI crew instrument tse05. The last 60m tower is now up and instrumented. I think its Its solar-power system is working as well (but, presumably due to power, the network is totally down, so we can't verify from here)needs a couple of batteries and then should be working.
- Andy and I prepped 4 more towers.
- Ted and Santiago prepped Ubiquitis, tweaked the network configuration, and arranged for a bittorrent stream of data to Boulder
- Gary doesn't know what he did, but he stayed warm working outside in the parking lot...
...