Taken mostly from qctables:

Radiometers: not getting rpile.in, tcase.in, others reporting (tried pushing scan i2c button, didn't fix) → swapped in radiometer with right id for longwave in, now all reporting.

NR01: updated PIC code and plugged into uw.  Isabel updated the configuration so data are expected.

Gsoil/qsoil/lambda: plugged in with latest PIC code. Getting data from all, qsoil values are slightly negative. Is this a problem?

Tsoils: all reporting, data looks good.

Pressure: all reporting, no data in qctables because it's outside clip limits which are set for Gothic. Data looks ok in ncharts.

TRH: all reporting (just replaced fuse + housing for 13m trh, it's reporting now but not yet making it to qctables), data looks good.

CSAT: all reporting after I swapped the sonic head on 10m.c (and previous resetting of some EC100's using ECmon).  Some heads are intermittent, but I presume this will clear up in the field.

EC150:

  • all h2o reporting.  Some heads were blocked by foam padding.  (3m.uw died over friday night)
  • alll co2 reporting, but about half are clipped.  Hoping this will go away in the field.
  • Note that, in the ECmon reconfiguring, I noticed 2 EC100 boxes that were set to force Tirga to 25C.  I think these are all fixed now.

Pillows: working, needed reboot of cl. There are only 2 boxes connected.   Saturday: Now back down to 1 pillow; pillow 2 doesn't respond, even manually.  Don't know why not.

Flowcaps: getting data from both flowcaps.  The second needed to have the power switch turned on its USB adaptor.  Both are now configured to the averaging we want (30/30/300).

Apogee IR: all reporting. Raw values look good, Steve is working on debugging the surface temp calculation.

Tsnows: Currently plugged in to d and ue.  (uw is done, but Chris is protecting the sensors so the cable doesn't reach.)  Looks good. 

Gps/chrony: finally started getting good GPS on uw, but just recently stopped getting good gps on ct. I'll look into it, see jira for more details. → ct fixed itself after I pulled the GPS antenna out to rest on the top of the dsm box.

Victrons: not staged, not planning to stage (actually want to stage at least one as part of a power drop test – Tony is building up power boxes for this)

Anything else I'm forgetting??

  • No labels

3 Comments

  1. Isabel Suhr AUTHOR

    CSAT/EC150 update 9/22:

    • all sonics fine except c10m, the one we tried replacing the sonic head on yesterday. Going to try replacing the ec100 box.
    • h2o missing at c 2m, 3m, 10m, 20m, uw 10m
    • co2 missing at all the ones with missing h2o, missing (not clipped) at d 1m, clipped at d 3m, ue 3m, c 5m, d 10m
  2. Diagnosing the snow pillow data not coming in for quite a while:

    • not seeing any prompts or responses to my manual prompts
    • ddn/dup didn't work
    • power to SDI adaptor board is fine
    • disconnecting/reconnecting the pillow electronics didn't work
    • rebooting the cl DSM got both sensors working, being prompted, responding to prompts.
    • Found that I had an extra ".p" in the suffix in sos.xml, that I've now removed, also edited stats_5min.xml, pushed to git, pulled into barolo~isfs, restarted statsproc, and now see netcdf data!
  3. Thought I'd be clever by pio BANK1 on/off to try to reset the pillow on Sat. night, but I think this also turned off power to the ethernet switch, so I can't get to cb any more.  I'll run in tomorrow AM to fix this.  Sorry.

    Sun noon: Power cycled cb which got it going again (it had been running, just off the network due to the router being powered off).  This also got the 2nd pillow up as well.