You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 4 Current »

Below is the calibration information for the kryptons to be deployed on METCRAX II

Sensor

Path

Kw

V0

1101

1.3

-1.788486E-01

3.209190E+03

1392

1.3

-1.616296E-01

3.748417E+03

1394

1.3

-1.640959E-01

3.694515E+03

1525

1.3

-1.663684E-01

4.169524E+03

  • No labels