8/30/16
Summary:
- light winds from the E to NE
Actions past 24 hours:
- installation of tall tower, network connection to tower is acting up
- no solar charger/power monitor at tall tower, replacement on its way from Boulder
To dos:
- replace battery at tall tower
- work on data displays
- shoot tall tower booms
Sensor status:
T/RH:
P:
2D Gill:
csat u,v:
csat ldiag:
csat w, tc:
EC150:
motes::
Wetness:
radiation:
Tsoil:
Gsoil:
Qsoil:
Cvsoil:
- Battery: