Nice weather after the cold front/rain yesterday.  Semmer has left, Andy to arrive Mon, so no pickup for 2 days.  I'm the Boss for another 3 days...

Still 38 instrumented towers.

  • rne04 supposedly was retensioned yesterday or Thurs.  Will wander up there to check.  If good, can add RMY.
  • tnw02/04/08 supposedly have concrete in place, ready for towers.  Will wander out there too to check today.  Checking prepping in ops.
  • tse05/14/15 will be worked on next week.  Prepping in ops.

Issues

  • li7500.v07 wanders off with bad values, but 4-hour crontab restart has been bringing it back
  • li7500.v06 is similar, but lidiag is aways set, thus no values are coming through statsproc.  Will need some action.
  • tp01.tse02/07/12 all not reporting – suspect plugged into wrong mote port (only works on right-most port with the new fuses)
  • trh.20m.rsw06 still bad.  will need action.
  • During prepping, have noticed things missing:
    • not enough motes.  The remaining 2 will be used for the 2 soil installations
    • only one mote console cable! (3 have a broken pin).  Will repair with spare connector.
    • having to use a not-Ted's ethernet cable, since I gave one to CU (thinking I had extra).
    • Ted had given away the ubiquiti for tse15.  I'm reprogramming the next-to-last spare.

 

  • No labels