BEACHON Tower Guy-Wire Tensions (lbs).....THIS SHOULD BE AN ON-GOING LOG
Modifications:

Inner to Outer...

South Guy-Wire:

Guy-Wire

7/7/09 Sharon
(7/8/09 Ned)

7/17/09 Ned

8/28/09 Ned

Inner (Close to tower)

500 (425)

425

350

 

550 (510)

460

405

 

500 (420)

380

355

 

500 (500)

460

415

 

500 (400)

370

330

Outer (Farthest)

450 (400)

350

330

Northwest Guy-Wire:

Guy-Wire

7/7/09 Sharon
(7/8/09 Ned)

7/17/09 Ned

8/28/09 Ned

Inner (Close to tower)

600 (490)

450

375

 

550 (500)

450

405

 

450 (500)

470

445

 

600 (500)

450

400

 

440 (415)

410

355

Outer (Farthest)

430 (400) 

360

345

Northeast Guy-Wire (nearest to the road)

Guy-Wire

7/7/09 Sharon
(7/8/09 Ned)

7/17/09 Ned

8/28/09 Ned

Inner (Close to tower)

580 (470)

440

360

 

600 (550)

500

425

 

680 (670)

590

575

 

500 (460)

450

375

 

600 (525)

500

425

Outer (Farthest)

480 (405)

410

360

090717, jwm     Added readings by Ned Patton on 7/17/09.  Note roughly 100-lb drop on each, but there was no shift on the anchors/base per-paint applied; ie stretching.

090828, egp Anchors did not exhibit any shifting, added new readings to the tables above.