Trying to get a current picture of what needs to be done. Edit as necessary
- Since we will be climbing all towers, check guy tensions on all towers
- Tensiometer and climbing equipment is all in the barrel. Make sure the barrel is accessible (I don't think this will be a problem this visit)
- Keep to paths to minimize impact on snow inside triangle. Make sure we bring map + leave in barrel.
- Replace apogee cables on all towers.
- Use rs during switch to make sure it's reporting same values before and after cable swap.
- Try to make sure popsicle sticks/cable connections aren't horizontal, so they can shed water better.
- Snow pillow #3 software update: are we still trying to do this, now that we know it doesn't completely solve the pillow dying issue?
- Troubleshoot Ethan's lidar pis
- pi 4, which has never connected: try replacing sd card with the sd card from pi 8. If that doesn't work, replace the whole thing with pi 8
- pi 1, which was connected until recently: try power cycling via unplugging/replugging the power cable. If that doesn't bring it back, try replacing sd card with the one from pi 7. If that doesn't work, replace the whole thing with pi 7.
- Should we plan to log in to the cradlepoint on site to see if pis have connected, or can this be done remotely? If we're going to log in onsite, does it make sense to bring wstar out? Would be annoying to try logging in to the cradlepoint interface from a phone (if it's even possible..?)
- 5m.c sonic troubleshooting
- try replacing the EC100 box first, then if still bad try replacing the csat/ec150 heads.
- were we going to try adding the updated cassette mount???
To bring from Boulder:
- copy of site paths walking map
- apogee cabling
- (if trying snow pillow software upgrade) callab windows laptop, dongle to go between laptop and snow pillow
- two spare pis in enclosures from Ethan
- polk to haul ec150/csats in cases