You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 2 Current »

Yesterday deployed sonics and added 30W solar panels at SSW2 & SSW4.
Measured azimuths of csat sonics in crater.
Fixed P.rim and csat.15m.rim.
Replaced radiation mote and restarted SPN1 mote at FLR.
Sebastian cleaned radiometers and kh2o at FLR.

Review of cockpit around 11am:

T/RH:       OK
P:          OK, P > 850 mb on crater floor
csat u,v:   OK
csat ldiag: OK, flr was at +1 at a previous time
csat w,tc:  OK, w > +/- 5 m/s at rim
kh2o:       kh2oV.flr = 0; kh2oV.far > 2 V
wetness:    rad.flr, far are RIP
radiation:  rad.flr, far are RIP
Tsoil:      near is RIP
Goil:       flr is < -100 W/m^2, far & near ~ -50 W/m^2
Qsoil:      far & flr = 0, near OK
TP01:       Vheat OK; Vpile on OK, near=1000 uV, others ~ 600 uV; Vpile.off=0; tau OK; lambdasoil are RIP
Spd, Dir:   OK
T/RH:       OK

  • No labels