Today was a crater day with all ISF and most Utah staff. ISF equipment is now completely packed and (nearly) ready for helo operations. Base tower is now shut down as well.
Floor GPS positions:
Location |
Latitude |
Longitude |
DOP |
---|---|---|---|
FLR Tower |
35d 01.686' |
111d 01.342' |
5 |
Radiometer stand |
35d 01.680' |
111d 01.353' |
5 |
Soil plot |
35d 01.680' |
111d 01.341' |
5 |
Soils depths (approx):
Single Tsoil: 1cm
Quad Tsoil: Nub just below surface
Gsoil: 1cm
Qsoil: 2cm
TP01: 2.5cm
Some of the cables were slightly exposed. Chris and I wondered if rain/wind removed some of the soil layer. I took a few photos.
flr boom angles (calibrated DataScope at this location just before making reading):
3m CSAT: 39.8d looking into array
10m RMYoung: 346.8d looking along boom, aligning two transducers, junction box on back side (to the north).