9/6/16
Summary: Winds out of the N, NW at 6 to 12 m/s. Clear skies.
The plan to day is spend some time in the Marsh.
Actions past 24 hours:
- continue work in base on looking at data
To dos:
- visit site 8 to repair power
- visit site 15 to bring bad NR01 back to base and check out mote #2
- visit site a few other sites as potential energy balance locations and install rain gauge
Sensor status:
T/RH: ok
P: ok, Pirga now scaled correctly on cockpit
2D Gill: ok
csat u,v: ok
csat ldiag: ok
csat w, tc: ok
EC150: ok
motes: mote#2 not coming in
Wetness: ok
radiation: ok, SWin at mote#1 is questionable
Tsoil: down
Gsoil: down
Qsoil: down
Cvsoil: not responding
Vbatt: ok