9/9/16
Summary: Light winds, < 5 m/s, out of the SW, partly cloudy.
Morning trip to the Marsh to work on S8, S15, and S4 (rain gauge).
Actions past 24 hours:
- Morning Marsh visit to 4, 8, and 15
To dos:
- installation of rain gauge at S4
- installation of NR01 and mote #1 at S15 and install new TP01 PIC
- repair of power/monitor system at S8
Sensor status:
T/RH: ok
P: ok
2D Gill: ok, down at S8
csat u,v: ok
csat ldiag: ok
csat w, tc: ok
EC150: ok
motes: ok, no soil at #1 and #3
Wetness: ok
radiation: ok
Tsoil: ok
Gsoil: ok, monitor since it is now coming in
Qsoil: ok
Cvsoil: not responding
Vbatt: ok, battery at site 15 getting low at night, will monitor