9/14/16
Summary: Light winds, < 5 m/s, out of the WSW, clear,
Worked on new DSM to test questionable GILL 2D cable. To verify
DSM was setup correctly built a test cable for the GILL. Test cable
verified DSM was setup correctly so 2D cable is bad. Will take back to Boulder
Actions past 24 hours:
- Base work, no boating yesterday
- build test cable to check GILL 2D and DSM settings
To dos:
- move Mote #1 and NR01 to site 9
- add soil probes to Mote #1
Sensor Status:
T/RH: ok
P: ok
2D Gill: ok
csat u,v: ok
csat ldiag: ok
csat w, tc: ok
EC150: ok
motes: ok, mote #1 does not have soil probes
Wetness: ok
radiation: ok
Tsoil: ok
Gsoil: ok
Qsoil: ok
Cvsoil: not responding
Vbatt: ok