Clear skies, but windy, cool.
Kate arrived. SteveO leaving today.
To dos:
- Reshoot boom angles at 60m and CSAT S8 and S15 We've set up the binos on a tripod.
- Soil core at S1, a second at S15
- Install and "manually" read another TP01. Steve is taking two TP01 wisard boards back to Boulder for rehab.
- Install EC150 at S13. We've checked that it is ready to go.
Station Status: All up.
Sensor Status:
T/RH: 42m TRH now not reporting. Power cycle does not bring it back. Others okay (note that S1,2,9,10 are wired not to report Ifan).
P: ok
2D Gill: ok
csat u,v: ok
csat ldiag: ok
csat w, tc: ok
3D RMY: ok
EC150: ok
motes: ok
Wetness: ok
radiation: ok
Tsoil: ok
Gsoil: ok
Qsoil: ok
Cvsoil: Ready to manually read sensor
Rainr: ok, reported about 1/4" today.
Vbatt: Vbatt.tower at 12.6V on 10/9