Sunny and clear. Low winds from the South.
To do:
- Reshoot boom angles at site 8 where we used tripod for stabilizing. We think tripod could be affecting the compass.
- Test wisard board in the trailer
- Install wisard board on the soil TP sensor at site 1.
- Clean radiometers at station 9
Ongoing:
- Watching main tower wdir data and forecasts to determine appropriate conditions to have wind turbine turned off (at the request of the PI). She's looking for ENE winds between 40-80deg greater than 5m/s
**Down day planned for tomorrow
T/RH: 42m TRH still reporting warmer and drier than at other levels
P: ok
2D Gill: ok
csat u,v: ok
csat ldiag: ok
csat w, tc: ok
3D RMY: ok
EC150: ok
motes: ok
Wetness: ok
radiation: ok
Tsoil: ok
Gsoil: ok
Qsoil: ok
Cvsoil: Will test install today
Rainr: ok.
Vbatt: ok