You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 2 Next »

BEACHON Tower Guy-Wire Tensions (lbs).....THIS SHOULD BE AN ON-GOING LOG
Modifications:

090717, jwm     Added readings by Ned Patton on 7/17/09.  Note roughly 100-lb drop on each, but there was no shift on the anchors/base per-paint applied; ie stretching.

Inner to Outer...Sharon reading 7/7/09 (Ned reading 7/8/09)

South Guy-Wire:

Guy-Wire

7/7/09 Sharon
(7/8/09 Ned)

7/17/09 Ned

Inner (Close to tower)

500 (425)

425

 

550 (510)

460

 

500 (420)

380

 

500 (500)

460

 

500 (400)

370

Outer (Farthest)

450 (400)

350

Northwest Guy-Wire:

Guy-Wire

7/7/09 Sharon
(7/8/09 Ned)

7/17/09 Ned

Inner (Close to tower)

600 (490)

450

 

550 (500)

450

 

450 (500)

470

 

600 (500)

450

 

440 (415)

410

Outer (Farthest)

430 (400) 

360

Northeast Guy-Wire (nearest to the road)

Guy-Wire

7/7/09 Sharon
(7/8/09 Ned)

7/17/09 Ned

Inner (Close to tower)

580 (470)

440

 

600 (550)

500

 

680 (670)

590

 

500 (460)

450

 

600 (525)

500

Outer (Farthest)

480 (405)

410

  • No labels