Weather:
Overcast, temperature hovering around freezing all day.
Tasking:
- Prepared and connected base trailer to power, lights and heat are now operational!
- Installed Central Pivot, save for outstanding sensors. Fuse in center pivot electronics box(source of 120v for station power) blew since it was a 1A, replaced with 5A
- Investigated Memorial Hill communication issues, station is up and collecting data but comms are down
- Trip to the hardware
2 Comments
Steve Oncley
In other news today...
(Doesn't seem like much, but managed to take the entire day, and did require some thought.)
Steve Oncley
...and I see that ncharts now has at least some data from MH, CC, and SP (though still labeled "ss"), beginning at ~1600 today...