We mainly worked at the profiler site again today.  Gary arrived and spent much of the afternoon on the computer side of things.  The rest of us did more work on the clutter fence, getting it angled correctly and tieing it down.  We tidied up cables, work on the cameras (testing and installing heating tape), set up the UPS and power distribution in the trailer and prepared for the lidar crane lift tomorrow.   We are still waiting on delivery of connectors before we can start up the profiler.  The University of Utah tethersonde trailer arrived at the DC Supersite and we visited that to check out how we might install the sounding system.


Tidying up cables and securing the clutter fence.