Just to start a list of what to do when/if(!) we get back next week – a fairly long list for 3 days!:

Site issues:

  • dcs is totally down.  It appears to have lost power on 21 Dec soon after being powered up and subsequently died on 26 Dec.  Could the Victron have V/I limit settings set incorrectly?  Update: Sebastian says that his power (connecting to our AC outlet) is fine.  This further suggests that this is a Victron issue, rather than AC power.  DONE, Victron was bad. Replaced.
  • pc is totally down.  Similarly, it lost power on 15 Dec soon after being powered up and died 23 Dec.  AC not getting from power panel to job box – cable issue?  DONE, extension codes became unplugged under the snow.
  • lc power cord was cut by plow.  Might stay up until we get there and replace the cord. 
  • up may or may not have a power drop, so might need to create another solar farm. (Do we have cables?)

Existing sensor issues:

  • Most sonics are reporting NA, though they did work initially.  Assuming this is ice related (try more heating?), but might check with Campbell to see if a configuration change would help.  See table below
  • Most EC150s also show missing data.  However, in at least one case, I've found the EC150 data to be okay – just missing because statsproc processes it in a group with the sonic data that ARE bad.  Hopefully, fixing the sonics will bring back the EC150 values.
  • A thermocouple appears to have been plugged in at sh on 19 Dec, but seems to have died on 21 Dec – just 2 days later.  While it was plugged in, the data look good, though not exactly like tc (maybe a good thing).  I do see noise above 3Hz during the day and 8Hz at night.
  • Rfan.3m.prs is bad (T/RH ok).  Housing should be replaced?  DONE, old housing had no fan!
  • Rlw.in.2m.prs not reporting (in the CVF4 housing) – another Binder issue?  DONE, mote wasn't sampling, then Rlw.in wanted to be opened up all the way and reassembled.
  • Tsoil.mw is all -273.  Hopefully, just a loose Binder connector. DONE, was loose Binder.
  • P.2m.prs was missing horizonal pipe mount. FIXED
  • HRXL.cc stopped reporting 24 Dec.

Sensor changes:

  • reconfigure radiometers into operational mode at dcs and prs.  Have new mounting for 0.5m radiometer "paddles".
    • move CVF4 Rlws to darkhorse
    • move other paddles to 0.5, 7, and 32m (booms for 7 and 32 are on site at each site) – lots of cables to redo.  Sebastian will help.
  • attach thermocouples and loggers to towers at dcs and prs.  Eric said he'd do most of this work.
  • raise both TTs

Standard operations:

  • finish recording serial numbers (a table has been started in this wiki)
  • take site photos (maybe Dan has already done?)
  • shoot boom angles (compass, then Leica)
  • take the first set of gravimetric measurements (though freezing soil probably will have moisture that the EC-5 doesn't see).

Software:

  • test heating scripts
  • it appears that I'm close to parsing the RAD_LOGGER message correctly, but we should check with Sebastian.  I suspect that my "Rpile" variable from him really is an uncalibrated pile voltage.
  • why are there still "Early sample...prior to sorting window" errors using prep?  I thought our new timing fixed all this!
  • why are there frequent "EMERGENCY|SampleOutput: inet:128.117.43.122:30010: IOException: inet:128.117.43.122:30010: send: Message too long, disconnecting" error messages on the DSM consoles?  Could these be from the OTT, that reports something like a 32k byte sample?
  • create irga_co2/h2o.dat QC files by height for supersites
  • update all csat.dat QC files once boom angles are known.

Sonic status:

siteec100ec150csat
upokokok
lcok (fuse replaced)okok
ccokokok
dcokokok
spokokok
shokokx
mhokokok
pcokokok
mwok (replaced)xok (replaced)
prs.1mok (replaced)okok
2mok (replaced)okok
3mokokok (replaced)
7mokokok (replaced)
17mbad port (will need to replace dsm)ok?ok?
32mokokok (replaced)
dcs.1mokokok
2mokxok
3mokxok
7mokokok
17mokokok
32mokokok