Started chilly, then nice, then windy and cold, then a nice evening.
Dan has started PTO – Thanks for everything!!
PRS:
- lowered TT
- reseated connector to Rlw.xx.7m and got it going
- dressed cables up TT and closed off spiral cable guides
- raised TT (finally!), up about 10AM
- removed Sebastian's darkhorse
CC:
- unplugged and plugged in USB serial dongle, then restarted NIDAS. Got HRXL going
DCS:
- replaced TRH housings at 1m, 3m (they didn't have fans!). Now both are working
- reconfigured mote IDs on Rsw.xx.2m and now see data
- lowered TT
- replaced TRH housing at 17m that was working (so data would have been fine, just had been reading too high Rfan). Replacement is normal.
- installed thermocouples at all 3 levels
- closed off spiral cable guides
- raised TT
- connected TC_LOGGER to dcsr, port 6 and changed config (but don't see data yet)
- installed thermocouple connectors at 1, 2, 3m
- installed an actual thermocouple at 3m
SH:
- asked Chris to FedEx an early CSAT3A to us to replace the one that has been removed. It will need a special mount.