Started chilly, then nice, then windy and cold, then a nice evening.

Dan has started PTO – Thanks for everything!!

PRS:

  • lowered TT
  • reseated connector to Rlw.xx.7m and got it going
  • dressed cables up TT and closed off spiral cable guides
  • raised TT (finally!), up about 10AM
  • removed Sebastian's darkhorse

CC:

  • unplugged and plugged in USB serial dongle, then restarted NIDAS.  Got HRXL going
  • did a crude compass boom angle shoot of 237deg magnetic (248 true) looking into the boom.

DCS:

  • replaced TRH housings at 1m, 3m (they didn't have fans!). Now both are working
  • reconfigured mote IDs on Rsw.xx.2m and now see data
  • lowered TT
  • replaced TRH housing at 17m that was working (so data would have been fine, just had been reading too high Rfan).  Replacement is normal.
  • installed thermocouples at all 3 levels
  • closed off spiral cable guides
  • raised TT
  • connected TC_LOGGER to dcsr, port 6 and changed config (but don't see data)
  • installed thermocouple connectors at 1, 2, 3m
  • installed an actual thermocouple at 3m
  • discovered that AC power was off (when Utah started plugging lots of things in).  Turned out to be a loose plug at the power panel.  Have tried to connect, but don't get a solid "click" when trying to turn.  We'll have to keep an eye on this.

SH:

  • asked Chris to FedEx an early CSAT3A to us to replace the one that has been removed.  It will need a special mount.