snow flurries, and about 0.5" on the ground.  Cloudy, temp about 25F with moderate wind.  Ground is frozen for first 2cm, so vehicles could drive into field. It was a bit hard to chip through the crust, but the ground was soft to remove soil sensors.

Kurt & Bob Wiley tore down all 6 pressure sites.

Dan & Steve (with some help from Kurt & Bob) removed all sensors/cables/batteries/aux towers from lconv, leaving the stripped 20m tower and solar panels.

Moved all sensors back to base.  Infrastructure still in the field.

We took a lunch break to warm up and refuel (ourselves).

Labeled batteries:

Decided not to record sensor serial numbers, since should already know them.  I wasn't sure about rad/soils, so:

All in all, we're pleased with how the day went.