Sunday Sept 17 Bruce arrived at the REAL about 0900 PDT.

This morning's 500 mb chart:

The winds are calm and there are high cirrus with scattered alto-cumulus clouds.

Clouds looking East 0900 PDT

Clouds looking West 0900 PDT

The raid disk was hot swapped out and is rebuilding - 1515 PDT.


Photos from the hot swap from left to right - 1 the server with the bad drive removed, 2 the new drive (in plastic case) and the old drive in the carrier, 3 the old drive removed from the carrier, 4 the new drive, the server with the new drive installed. fields

The server manufacturer (Colfax international) was very helpful in restoring the server to full health.  There is a very long string of emails between Colfax support, Shane and Bruce that identified the bad disk and allowed us to make a field repair.

Nice wind field estimates today - below is an example.

Above: REAL PPI and wind field estimate 1528 PDT

Below: REAL rooftop cam at 2:30 PM

REAL rooftop cam at 7:14 PM


This evening's 500 mb chart: