Created by Unknown User (munnerly) on Jan 09, 2019
No labels
1 Comment
Unknown User (munnerly)
L6 and R5 physical install complete. Inspected by Brent. Attached power cables. Need to install ethernet to both racks, will do after pilot pro. 3-7-2019 JAM
Installed Ethernet cables R5 and L6.
Temp Probes, from Cory "Let's fly 630393 for Eclipse. No fast response measurements are necessary so we'll just use the heated sensor."
Installed dew point sensors, troubleshooting in progress, on ADS Status Page all DSMs except ACserver read critical, stopped. Have notified SE, will delay troubleshooting DPs until SE finishes, could be software problem. 3-6-2019 JAM
1 Comment
Unknown User (munnerly)
L6 and R5 physical install complete. Inspected by Brent. Attached power cables. Need to install ethernet to both racks, will do after pilot pro. 3-7-2019 JAM
Installed Ethernet cables R5 and L6.
Temp Probes, from Cory "Let's fly 630393 for Eclipse. No fast response measurements are necessary so we'll just use the heated sensor."
Installed dew point sensors, troubleshooting in progress, on ADS Status Page all DSMs except ACserver read critical, stopped. Have notified SE, will delay troubleshooting DPs until SE finishes, could be software problem. 3-6-2019 JAM