Action Item:

Action Item                                                                                                                                    

Completion Date

Teri

obtain an event budget from Emily ($200 for signage, materials for 200 makers)

 

Eileen

schedule time for Spark Maker-convention presenters to test the apparatus and the design materials to be made available

 

Teri

once determined, Teri to ensure needed items are purchased including snow cone cups, etc. with Natalie's assistance

 

Teri

Check on logistic questions from event planners: booth size, balloon, ceiling height, # of participants, # of exhibitors

 

Tim

Build Score board

 

Lisa

Develop/design needed signage

 

Randy

work with EOL to obtain any "Table Tech" in the way of dropsondes and a dropsonde release video

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  • No labels