Next, tore down DC.  Soils were even harder, since the popsicle sticks themselves were buried.  Hot water trick helped, but still took perhaps 3 man-hours.  All probes recovered.  The ISS CS125 was loaded into the lidar trailer.

Next, tore down MW (in just 1 hr!).  Soils were easier, since top 2 cm were thawed.  However, managed to chop through the Gsoil sensor cable twice (itself, already repaired earlier).  Other 3 sensors were okay.

A long day, but good progress and a great team.

Tomorrow is forklift day.  Plan to hit PRS, then DCS for fenceposts, power, and other cleanup, then remove CC.  I hope this works!  I guess the worst case is we rent it for a second day.