Will and I are here for ISFS. Bill, Isabel, and David are here for ISS. Tony and Josh expected in a few hours.
Morning:
- Orientation for everyone
- Added RF4 flag (far end of DTS fiber, though with no offset from the REAL line)
- Created 2-track with turnarounds at the end of the DTS line and the end of the tower line
- Dropped off chem shelter near DTS start
- Dropped off 4 solar panel racks with coolers (so far) along tower line
- Dropped off feet/generator/job box at TT, showed Will how to drive there.
Afternoon (Tony and Josh arrived halfway through):
- Dropped off the rest of the solar racks and coolers along the tower line – might need a second rack at t0. Still need to drop off a rack or two at TT. Also need to drop any extras at chem shelter
- Dropped off all the base plates we had – we are short 2, but Tony thinks there are a few more in the base trailer.
- At the same time, dropped off about half of the 5' sections (all we could load in one pickup load). THANKS ISS staff for helping with this load – it went really quickly!
I guess I should explain the layout plan (hopefully the diagram below helps). This is my understanding from various discussions:
...