You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 2 Next »

Timing:

  • Steve runs to Logan to pick up repaired sonics?
  • Steve already there; Clayton arrives 2/23 (last day of ops)
    • strip all towers of instruments, pack in base
      • remove heating stuff from CSATs
      • good luck removing soils!
    • provide some assistance to remove PI sensors
      • sort out NCAR vs. UU radiometers/ventillators
      • return HRXLs
      • return CS125s (DC is ISS's, I think)
    • return to remove satellite infrastructure, pack in 16' Penske
  • ??, Tony, Chris arrive 3/2ish
    • coil up supersite power cables, pack in Penske for Boulder
    • help remove cc solar panels (hope we can drive in, or rent tracked vehicle from equipment place, or leave in place till later)
    • remove fencing
    • pull TTs out to BW road
  • someone pulls Ubiquiti from school roof

Need to arrange:

  • Trailer Transit for base to SWEX (Dan did, pickup on 4 Mar afternoon)
    • loaded with
      • all sensors
      • a few CFACT DSMs as spares
      • cell modems pulled from CFACT DSMs
  • Trailer Transit for TTs back to Boulder (Dan did, 26', pickup on 4 Mar from BestWestern)
  • Penske from Boulder to bring SWEX infrastructure (Dan did, pickup 2/28 from Loveland)
    • PAM tripods; booms; clamps
    • more job boxes/batteries?
    • SWEX DSMs
  • Penske in Heber to return to Boulder (Dan did, 16', pickup 2/23 from Strawberry).  Load infrastructure directly into this.
    • power cables/transformers
    • Rohn towers
    • thermocouple motes
    • anything dead (solar panels with bad connectors, etc.)
    • v2.7 stuff, Kipp&Zonens, ventillators
    • bulk of CFACT DSMs

Issues:

  • Leave ventillation on NR01s, plugs into DSM AUX for power


  • No labels