Preparing:

  • inventory: job boxes (3 in storage), manfrottos, otts (5 in lidar trailer, 1 in base), shts (only 13 in base), ???
  • TT license plates (now in base) (dcs now done)
  • OTTs to base from lidar trailer
  • break cables out of ice (3 spots for DCS)
  • pack up battery charger
  • pack up soil oven

Timing:

  • Steve runs to Logan to pick up repaired sonics?. The repairs have been delayed.
  • All drives to/from site (especially TTs) should occur in the morning, when the ground is harder.  Perhaps this means caching stuff on site and removing the caches in the mornings?
  • Steve already there; Clayton arrives 2/23 (last day of ops)
    • tear down entire site into pickup and Penske; transfer pickup stuff into base
      • start with satellites, since Sebastian won't be available Thurs AM 
      • remove heating stuff from CSATs
      • add washers to CSATs?
      • good luck removing soils!
      • figure out how to pack NR01s with ventillation systems
    • provide some assistance to remove PI sensors
      • sort out NCAR vs. UU radiometers/ventillators (relatively easy: CVF3s to UU, CVF4s to us; Bindered sensors to us, rest to UU)
      • return HRXLs to UU – just cut cables?
      • return CS125s (DC is ISS's – E3412)
    • packing:
      • Rohn towers/bases/guys to 16' Penske
      • solar/job box to 26' Penske
      • manfrotto/square booms to 26'
      • other booms (including all TT) to 16'
      • cables sorted to base
      • DSMs to 16'
  • Dexter available 3/1ish; Tony, Chris arrive 3/2ish
    • move solar panels, job boxes, manfrottos, etc from 16' to 26' Penske 
    • coil up supersite power cables, pack in 16' Penske
    • help remove cc solar panels, if not already done
    • remove fencing to 16'
    • pull TTs out to BW road, if not already done
  • someone pulls Ubiquiti from school roof
  • need to pull out everything from DCS by 1 Mar

Need to arrange:

  • Trailer Transit for base to SWEX (Dan did, pickup on 4 Mar afternoon)
    • loaded with
      • all sensors
      • a few CFACT DSMs as spares
      • cell modems pulled from CFACT DSMs
  • Trailer Transit for TTs back to Boulder (Dan did, 26', pickup on 4 Mar from BestWestern)
  • Penske from Boulder to bring SWEX infrastructure (Dan did, pickup 2/28 from Loveland)
    • PAM tripods; booms; clamps
    • more job boxes/batteries?
    • SWEX DSMs
  • Penske in Heber to return to Boulder (Dan did, 16', pickup 2/23 from Strawberry).  Load infrastructure directly into this.
    • power cables/transformers
    • Rohn towers
    • thermocouple motes
    • anything dead (solar panels with bad connectors, etc.) "bad stuff"
    • v2.7 stuff, Kipp&Zonens, CVF4s and cables
    • bulk of CFACT DSMs
    • round booms

Issues:

  • Leave ventillation on NR01s, plugs into DSM AUX for power
  • Bill wants his CS125 to go to SWEX

Organized by location:

  • 16' Penske
    • Power cables (all), probably need to be removed from field via pickup
    • transformers
    • TT generators
    • Rohn towers (all), base plates, guys/straps
    • most CFACT DSMs
    • fencing stuff
    • thermocouple interfaces
    • sonic heater stuff
    • CVF4s
    • Kipp&Zonens
    • used SHT85s
    • v2.7 motes
    • round TRH booms?
    • TT brackets
    • bad stuff
      • some TRHs
      • a DSM
      • a mote
      • the LC sonic?
  • 26' Penske
    • solar panels
    • job boxes
    • manfrottos
    • sonic booms
    • NR01 booms
    • create site boxes?
  • base
    • sonics/EC150s (EC100s with EC150)
    • TRH cases
    • QDPs (top shelf)
    • Otts and stands
    • Soils (1 tub)
    • DC power and data cables (sorted)
    • other sensor cables
    • cell modems
    • spare CFACT DSMs
    • NR01s (with ventillation)
    • v2.8 motes
    • cassette brackets
  • Lidar trailer
    • ISS CS125


Site-by-site:



roadcarrypowerjob boxesladdercommentsorder
lcmuddymediumlight AC, some digging and lots of ice/snow16'

straightforward, better in AM

extra clamp on mast


ccsnow crust (use snowmobile!)drive up?solar (10 racks), break ice/snow3no

dcokdrive uplight AC, ice/snow1nostraightforward
spdriveabledrive uplight AC, some snow/ice1nostraightforward, better in AM2
shpaveddrive uplight AC, snow/ice1nostraightforward1
mhicy patches (use chains), open bike gatedrive uplight AC, snow/ice13'

pcpavedshortishlight AC, some digging, no snow1nostraightforward4
updriveabledrive upsolar (2 racks), no snow1noaccess when frozen
mwokshortlight AC, no snow16'straightforward3
prsmuddydrive upheavy AC, transformers, no snow28'a lot of work, plus fence5
dcsmuddydrive upheavy AC, transformers, break ice 3 spots28'a lot of work, plus 3xfences6

Anything muddy, plan to drive in/out in morning.  Rent a UHV to shuttle in and out of MH and CC?

For a satellite site carry in:

  • ladder
  • crowbar (optional)
  • toolbag
  • boxes
    • CSAT case
    • EC150 case
    • site box
    • 3xcardboard boxes

Carry out:

  • job box
  • 2 batteries + charger
  • rohn section and base plate
  • manfrotto
  • ott stand
  • 7–9 stakes, 1 auger?, ground rod
  • 4 booms
  • CSAT
  • EC150+EC100+T beehive
  • 2xTRH (cardboard boxes)
  • NR01 (another cardboard box?}
  • site box with
    • QDP+fittings
    • soils+mote
    • DSM
    • spline ball
  • ladder
  • tooibag

Supersite trips:

  1. remove sensors
  2. remove trailer
  3. remove transformers and generator
  4. remove power cable
  5. remove fencing
  • No labels