Log in
wiki.ucar.edu
Spaces
Hit enter to search
Help
Online Help
Keyboard Shortcuts
Feed Builder
What’s new
Available Gadgets
About Confluence
Log in
SOAS Field Project - ISFS
Pages
Blog
Blog
2013
July
June
rain gauge comparison results
SOAS ISFS Status June 30
nc_server died
rain.tb fix long ago
Rain event
shower just started
walked power line
Soil repairs
SOAS ISFS Status June 29
another storm?
tour list
shower
tower work
SOAS ISFS Status June 28
gravimetric results
Radiometers mislabeled
up and down tower
Changed to IRQ4 on second emerald card on low
Soil Sample
SOAS ISFS Status June 27
Emeralds on Low went down
SOAS ISFS Status June 26
Moved base mote for ground sensors
soil rad mote power
Taped power cable to pond
SOAS ISFS Status June 25
Tower, pond GPS locations
13.9m sonic having difficulty
Tsoil.b replaced
AP24 down for test
Tsoil.b 0.6cm
SOAS ISFS Status June 24
new Tsoil.b but not settled
LAI-2000 measure measurements
fauna
LAI instructions
SOAS ISFS Status June 23
canopy heat storage
Battery replaced at soil.b
SOAS ISFS Status June 22
waves
few sprinkles
Site work
SOAS ISFS Status June 21
Soil and rad maintenance
Mote 32m status
Direct and Diffuse
SOAS ISFS Status June 20
People at SODAR
Rad cleaning
32m mote back up
Open House
32 and 20m sonics these past few nights
Wetness at Pond back up
Tower climbing
SOAS ISFS Status June19
PAR-Tsfc mote at 32m down
rain again
Battery change at soil.a
Rainr.b clogged
Vmote changes
Tsoil.4.4cm.b bad after rain yesterday
SOAS ISFS Status June 18
32m sonic was down
Storm upon us
fierce storm outflow
8KVA fuse blown
SOAS ISFS Status June 17
Tree species surrounding the turbulence tower
Emerald cards on low stopped
Secured pond tipping bucket
Wetness.pond removed
WebCam images
SOAS ISFS Status June 16
shower count
soil gravimetric processing
mote peal-and-seal
Tsoil.b now okay?
Soil B activity
wetness now on mote 18 (a2)
cleanings
Tsoil.b
Rad wetness moved to soil.a2
Soil Samples
SOAS ISFS Status June 15
Rsw.in
8m sonic
New Tsoil installed
8m sonic restarted
rain last night
8kVA Surge fuse Blew
Soil b Rain Gauge Clogged
Adjusted WIFI tx power
WXT Azimuth
SOAS ISFS Status June 13
20m barometer reset
Verizon Modems Up
20m Licor Fixed
Loaner Licor Installed
SOAS ISFS Status for June 12
All Optics Cleaned
webcam
SOAS ISFS Status for June 11
32m Licor Removed
Mote Batteries Replaced
SOAS ISFS Status for June 10
3kVa Transformer fuse blew
20m CSAT
Rotated kyrpton heads horizontal
Licor 7500 at 32m
Daily status, June 9
Recycled power on TRH.8m to start fan
20m sonic is suspect
Chris cycled power on the 20m mote
Dried 2m kh20 with handkerchief, Chris later cleaned kh2o
Recycled power on soil.a mote
Daily status, June 8
Replaced soil.a and radiation batteries
Daily status, June 7
WXT rain
8 m mote has been dead since yesterday afternoon
Licor at 32 m is flaky
Tower sensor maintenance
Sonic azimuths
Daily status, June 5
8kva transformer fuses
Updated nidas and config on DSMs
Summary of work at pond
Restarted soil.a mote
Status June 4
Maintenance on soil a and b sites
32m Licor restarted
Turnipseed sonic
K&Z CNR4 height
Installed replacement Everest Tsfc sensors
Status, June 3
Reset soil.a (rad) mote
Reset 13.9m TRH
Status, June 2
4G modem
Moved router and Verizon modems to top of tower
Cleaned surface radiometers
Replaced mote battery at soil site B (rain)
Removed bad Everest Tsfc sensors from profile tower
Tower service
Ethernet work on tower
Guy wire tensions
May
April
Browse pages
Configure
Space tools
A
t
tachments (0)
Page History
Page Information
Resolved comments
View Source
Export to PDF
Hide Inline Comments
Blog
2013
June
29
Jira links
shower just started
Created by
Steve Oncley
, last modified on
Jun 29, 2013
Dark clouds, winds picked up, and now light rain. Same old drill...
weather
Overview
Content Tools
{"serverDuration": 86, "requestCorrelationId": "d8d99b494bc36739"}