applied power to TrNW01, Vall03, and fixed dc power cable to TrSE12 (a vehicle, probably the electric company tore it literally out of the electric box. We raised a new cable by about 1 meter over the old location and flagged the part overhanging the road.
Replaced soil mote cable which had been also yanked out of the mote box, and had bent pins.
Multiple TRH's were replaced at various stations - looks like that will be the lions share of work during the IOP, replace, repair, repeat.(Gnats are gumming up the fans)
There are now 37 stations collecting data and on the network.